Customization: | Available |
---|---|
After-sales Service: | 3months-1year |
Application: | Electrical & Electronics |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
System Parameters | |
Rated voltage/current | 3phase 3wire 10500V, 50/60Hz |
Max load power | Resistive load: 2100kW |
Load steps | Resistive load: 5teps,100,200,400,600,800kW Note: 1. When the input voltage is lower than the rated voltage, the load cabinet gear power varies according to Ohm's law. |
Power factor | 1 |
Load tolerance(overall) | ±3% |
Phase unbalance grade | ≤3% |
Display precision | Class 0.5 |
Control Power Supply | External 3phase 5wire(L1/L2/L3/N/G)AC380V/50Hz, around35kW |
Wiring method | Load power supply input--cooper bar(star connection) Control power supply input--connector bar |
Communication interface | RS485,RS232 |
Insulation class | Class F |
Protection grade | Storage IP55 |
Duty cycle | Continuous |
Cooling type | Forced air cooling, side air in, upper wind out. |
Enclosure structure | Container packaging, box body with personnel access door, and locked, Equipped with a ladder up to the top, entry and exit air protection door, internal protective net to prevent foreign body from entering |
Transportation | Lifting, load-bearing ring on the top of the chassis, meet the lifting and transportation conditions. |
Enclosure color | RAL7035 |
Enclosure dimension | About 6058mm×2438mm×2591mm(L×W×H) |
Weight | About 6500kg |
Colour of remote controller | black |
Remote Controller | About 492mm×395mm×216mm(L×W×H) |
Controller weight | About 10kg |
Working environment parameters | |
Using Place | Outdoor |
Ambient Temperature | -20ºC~+50ºC |
Relative Humidity | ≤95% |
Altitude | ≤3000 meters |
Atmospheric Pressure | 86~106kPa |
Ventilation distance | The air inlet is required to be 3 to 5 meters free of obstacles. The air outlet is more than 3 meters away from the roof or other obstacles. |
Reserved distance | In order to facilitate access, there should be no obstacles 3 meters in front of the control room. There should be no obstacles 2 meters in front of the maintenance room. |
Safe working distance | There should be an isolation fence 1 meter away from the load cabinet. When the load cabinet is working, there should be no staff within 3-5 meters. |