Customization: | Available |
---|---|
Application: | Electrical & Electronics |
Color: | According to Customers′prefer |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Resistive load bank 1500KW electrical load bank for generator testing
Load banks are used to commission,maintain and verify electrical power sources such as diesel generators and uninterruptible power supplies. The load bank applies an electrical load to the power source and dissipates the resulting electrical energy through resistive elements as heat. The resistive elements are cooled with motorised fans within the load bank construction
Load bank are primarily used for testing electrical power output on diesel generators,gas turbines and UPS systems whilst carrying out commissioning and maintenance work.
Introduction
1.1500kw load bank combines the dry type load module and measurement and control module, precisely test output power and load performance of kinds of generator set, and realize setting, fluctuation, instant load, instant unload, record wave analysis, and harmonic wave analysis, so to finish all the static parameters and dynamic parameters testing.
2.System can load power in rated range, measure generator steady-state 3 phase voltage, current, active power, reactive power, apparent power, power factor, frequency, and running time, and simulate the generator set real load working state. Power input using sectional type, energy dissipation type load, forced-air cooling, 3 phase fan decentralized supply air, air-flow is sufficient and low noise.
3.Electrical load bank test 250KWoutdoor load banks for generator UPS testing can work with PC software to realize intelligent operation, automatically finish the parameters testing, and create testing data table, curves and reports that can be printed, reduce a lot of manual operation.
Technical Parameters |
||
Rating Voltage/Frequency |
AC400V 3 phase 4 wire ,50/60Hz |
|
Max Load Power |
Resistive Load: 1500kW |
|
Load Step |
Resistive Load:total 16 steps:1,2,2,5,10,10,20,50,100,100,200,200,200,200,200,200kW When the input voltage is lower than the rated value, the load bank power changes according to Ohm's law. |
|
Power Factor |
1 |
|
Load Tolerance(each step) |
±5% |
|
Load Tolerance(overall) |
±3% |
|
Three Phase Unbalance |
≤3% |
|
Display precision |
Class 0.5 |
|
Control Power Supply |
External AC400V 3 phase 5 wire /50Hz |
|
Wire Connection |
Load Power Supply Input--Busbar (Star Connection) Control power supply input--Terminal Block |
|
Communication Interface |
RS485,RS232 |
|
Insulation Class |
F |
|
Working |
Continuous |
|
Cooling |
Forced air cooling,Horizontal inlet and upwards outlet |
|
Transportation |
Lifting, lifting ring at the top of case, with forklift at bottom, without casters |
|
Color |
Grey(RAL7035) |
|
Dimension |
About 2400mm×1700mm×1950mm (L×W×H) |
|
Weight |
About 2500kg |
|
Operating Environment Parameter |
||
Work place |
Indoor |
|
Temperature |
-10ºC~+50ºC |
|
Relative Humidity |
≤95% |
|
Altitude |
≤2500m |
|
Atmospheric Pressure |
86~106kPa |
|
Main component brands |
||
Contactors |
Schneider |
|
Fuse |
MIRO |
|
PLC |
Siemens |
|
Data management software |
(self-developed) |
|
Alloy Resistance |
(self-developed) |
Certificate and qualification
Company structure
Overview of company
What We Can Do
1. Professional technical team with more than 20 years design experience.
2. Customized technical solutions meet customer's individual requirements.
3. Skilled workman insure the reliable assembly technology.
4. Strict inspection procedures throughout the whole production flow.
5. Prompt delivery & custom clearance make sure the customers receive the goods on time.
6. Perfect after sales service create good user experience.
7. Reliable quality & competitive price help customers to maximize profits.
8. Timely feedback save valued time for the customer.
9. Humanized management system build homelike work atmosphere.
10. Continuous devote to public welfare undertakings strive for harmonious society.
Exihibition hall