Main functions:
1. Users can set adjustable load power within rated power.
2. Current, voltage, frequency, power factor, and active power, reactive power, and apparent power can be displayed.
3. With software programmable control, graphs of current, voltage, frequency, power factor, power can be displayed, saved and printed.
Control mode: manual control (control panel) with remote controller box or PC control.
Display meters: multi-function digital meter or generator tester.
Protection: Over load protection, over heat protection, short circuit protection, Emergency stops switch, etc
Technical Parameters | |
Rating Voltage/Frequency | AC three-phase four-wire 400V/50Hz/60Hz |
Max Load Power | Resistive Load:200kW |
Load Step (AC400V/50Hz) |
Resistive Load:9 steps,1,2,2,5,10,20,40,40,80kW Noted: When input voltage is lower than rated voltage, gears power changes according to Ohm's law. |
Power Factor | 1 |
Load Tolerance (overall) | ±3% |
3 Phase Unbalance | ≤3% |
Display precision | Class 0.5 |
Control Power Supply | External AC single-phase AC110-240V/50-60Hz .About:2kW |
Wire Connection | Load bank input--Wiring bar (star connection); Control power input--3-pin socket |
Communication Interface | RS485 |
Insulation Class | F |
Working Mode | Continuous Working |
Cooling | Forced air cooling, side inlet, upper outlet. |
Transportation | Haft |
Color | Oxidized white |
Dimension | About 750mm×511mm×746mm(L*W*H) |
Weight | About 80kg |
Operating Environment Parameter | |
Work Place | Indoor |
Work Temperature | -20ºC~+50ºC |
Relative Humidity | ≤95% |
Altitude | ≤2500M |
Atmospheric Pressure | 86~106kPa |
Ventilation distance | The air inlet is required to be 1 ~ 2meters free of obstacles. High temperature air outlet, more than 3 meters away from obstacles. |
Safe working distance | There should be an isolation fence 1 meter away from the load cabinet. When the load cabinet is working, there should be no idle personnel within 3-5 meters. |
Hebei Kaixiang Electrical Technology Co., Ltd is a leading manufacturer in emergency power supply test & maintenance industry. Specialized in the design, R&D, manufacture of the high capacity AC & DC load bank, it owns the largest intelligent power supply testing equipment R & D centre in China.
The company's core technologies are independent research. there are seven patents, ten software copyrights and two corporate standards. It has been named the international advanced level scientific and technological achievements by Science and Technology Department of Hebei Province.
Kaixiang offer one-stop solutions to generator set & battery & UPS power manufacturers. Its products are widely used in data centre, shipbuilding, offshore platform, state grid, nuclear power, hospital, communication, railway, war industry etc filed. Kaixiang is strategy partner of many famous company, such as Cummins, Caterpillar, Kohler, Jiangnan Shipyard, CSSC,CSIC, State grid, China mobile, Tecent, Baidu, Sinopec, CETC etc. Some of its products have been exported to America, Singapore, Israel, Japan, United Kingdom, Saudi Arabia, Australia, South Korea, Thailand, Sri Lanka, Angola etc. Through years of development, "Triumph Load" already the first brand in power supply detection industry in China.
Exihibition hall
Application
Large generator system testing in ocean engineering, drilling facilities,ship construction etc
Factory testing for generator, static voltage characteristic test, speed characteristic test;
Marine generator overload protection test,parallel operation test,reverse power and reverse
current protection test
Assist shipyard in mooring test,sea trial test
Assist with the acceptance of the vessel generator test
Eliminate the carbon deposition of generator
As the generator loading system
Periodic running test for standby generator
UPS inspection and maintenance
Ship battery charging/discharging system testing
The acceptance of new system and testing of servicing equipment
To reduce "wet stacking" problems